Skip to content

Business interruption insurance in the UAE

Business interruption cover pays for lost gross profit after an insured event stops or cuts your trading. No law requiring it has been identified. One insurer ties it to a property claim, and KEZAD's standard lease names it for at least two years.

Updated 3 min read

What does business interruption insurance cover?

It covers the gross profit you lose after an insured event interrupts your trading. GIG Gulf’s page calls the product consequential loss of profit and covers loss of gross profit after material damage from fire, lightning, storm, hurricane, earthquake, volcanic eruption, flood, impact damage or another insured peril at the insured premises.1

Does it depend on a property claim?

On GIG Gulf’s page it does. The page says the policy is valid only when there is an admissible claim under the property material damage policy. The interruption period starts from the date of the loss, with a two-week deductible, and runs until turnover and profit return to their level before the loss.1

A broker’s page links business interruption to fires, electrical faults, thefts, cyberattacks and water damage.

Ask your insurer whether a non-physical event, such as a cyberattack, can trigger cover.

Do you have to buy it?

No law requiring it has been identified. One business setup firm’s table calls it a commercial choice.2 Decree-Law 6 of 2025, Art 82, only says where cover for funds, property and liabilities in the UAE is placed, which is with licensed insurers. It does not name business interruption.3

Two other places can ask for it:

  • A lease. KEZAD’s standard lease terms have the tenant insure business interruption for a period of at least two years, alongside contents, civil liability, workers’ compensation and employer’s liability.4
  • A construction contract. A construction contract may deal with a related cover. One law firm guide describes delay in start-up cover as employer cover for losses from late completion, also called advanced loss of profits. It says liquidated damages are customarily capped at 10% of the contract price.5

Check your lease, lender documents and contract for a required period of cover before you buy.

What does the Civil Code say about your policy?

It leaves the terms to your contract. Art 955 defines insurance as payment on the risk specified in the contract. Art 963 limits the insurer to damage from the insured risk, up to the sum insured. Art 966 makes claims inadmissible 3 years after the event, with exceptions.6

Check the claim deadline in your policy.

Does the Central Bank publish figures for this cover?

The Central Bank report does not show business interruption separately.7 The property page has the fire and property figures.

The small print
  • Earlier lease. A warehouse and plot lease filed with the US SEC in 2022 (cl 21.1.4) also names business interruption for two years, to the extent available.8
  • Force majeure. Civil Code Art 236 ends the corresponding obligations and rescinds a bilateral contract where force majeure makes performance impossible. Partial impossibility lets a party invoke extinguishment or ask a court to rescind. Art 224 lets a court reduce an onerous obligation or rescind the contract after exceptional, general and unforeseeable events, and any contrary agreement is void. Neither article mentions insurance or lost profit.6
  • April 2024 storm. The storm brought 254.8 mm in 24 hours at Khatm al-Shakla.9 Guy Carpenter’s May 2025 paper estimates Gulf insured losses at around USD 3 billion in its summary and USD 2.9 billion to USD 3.4 billion in its body, with no business interruption share stated.10 The Central Bank report does not mention the storm.
  • Placement exceptions. Art 82(4) of Decree-Law 6 of 2025 gives exceptions to the placement rule, including cover not available in the State.3
  • Insurer wording. The GIG Gulf points above come from a product page, not a policy wording. One insurer only.

Before you speak to a broker

Business interruption insurance in the UAE

When the question comes up

What a broker may ask you

Nothing you tick here is saved or sent.

The rules in full

Definition Cover for loss of gross profit after an insured event interrupts trading. One UAE insurer sells it as consequential loss of profit cover alongside property insurance.

Key facts

Period named in KEZAD's standard lease4Tenant's business interruption insurance, lease terms effective 1 June 2026.
At least 2 years
Deductible on one insurer's page1GIG Gulf. The period starts from the date of the loss. Undated product page.
2 weeks
Time limit for a claim under the Civil Code6From the event, with exceptions. Art 966.
3 years

What the evidence supports

1Verified legal requirementA source sets it for this jurisdiction.
  • Cover for funds, property or liabilities in the UAE is placed with licensed insurers3Decree-Law 6 of 2025, Art 82. A placement rule, not a duty to buy. The text names funds, property and liabilities and does not name business interruption. Art 82(4) gives exceptions, including cover not available in the State.Last checked 4 Nov 2026
2Common contractual requirementDepends on your own contracts.
  • KEZAD's standard lease terms name business interruption for at least two years4KEZAD Group Standard Terms and Conditions for Lease, Version 4, effective 1 June 2026, cl 17.1. A lease term, not a zone regulation. The tenant also insures contents, civil liability, workers' compensation and employer's liability.Last checked 12 Nov 2026
  • A KIZAD lease filed in 2022 names business interruption for two years8Warehouse and plot lease filed with the US SEC in 2022, cl 21.1.4, to the extent available. One tenant's lease.Last checked 4 Nov 2026
1Potentially relevant coverA topic to look into. Not a requirement.
  • Delay in start-up cover5One law firm guide describes it as employer cover for losses from late completion, also called advanced loss of profits. It says liquidated damages are customarily capped at 10% of contract price.Last checked 4 Nov 2026
2Not established / verify with professionalNo source settles it.
  • A legal duty to buy business interruption cover2No law requiring it has been identified. One business setup firm's table calls it a commercial choice.Last checked 4 Nov 2026
  • Whether cover responds without physical damage1One insurer's page requires an admissible property claim. A broker's page lists cyberattacks among interruption causes. Ask your insurer whether a non-physical event can trigger cover.Last checked 4 Nov 2026

What the policy wording says

Question and readingStatusSourceEffectiveLast checked
Does cover depend on a property claim?⁠1The page says the policy is valid only when there is an admissible claim under the property material damage policy.ConditionalClause UNKNOWNGIG Gulf, Commercial property insurance product page. Not a policy wording.4 Nov 2026
When does the interruption period start?⁠1The page says it starts from the date of the loss, with a two-week deductible.ConditionalClause UNKNOWNGIG Gulf, Commercial property insurance product page. Not a policy wording.4 Nov 2026
When does the interruption period end?⁠1The page says it runs until turnover and profit return to their level before the loss.ConditionalClause UNKNOWNGIG Gulf, Commercial property insurance product page. Not a policy wording.4 Nov 2026

Readings are paraphrased unless set as a quotation.

Sources

10

1GIG Gulf, Commercial Business Property Insurance. Last checked 4 Nov 2026. Source document: Commercial Business Property Insurance

2startdxb, Business Insurance Dubai 2026: What Is Actually Mandatory, 18 September 2026. Last checked 4 Nov 2026. Source document: Business Insurance Dubai 2026: What Is Actually Mandatory

3CBUAE Rulebook, Federal Decree-Law No. (6) of 2025 Regarding the Central Bank, Regulation of Financial Institutions and Activities and Insurance Business. Art 82. Effective 16 Sept 2025. Last checked 4 Nov 2026. Source document: Federal Decree-Law No. (6) of 2025 Regarding the Central Bank, Regulation of Financial Institutions and Activities and Insurance Business

4KEZAD Group (AD Ports Group), KEZAD Group Standard Terms and Conditions for Lease, Version 4, effective 1 June 2026. Cl 17.1. Last checked 12 Nov 2026. Source document: KEZAD Group Standard Terms and Conditions for Lease

5Kayrouz and Associates, Insurance in Construction Contracts in the UAE. Last checked 4 Nov 2026. Source document: Insurance in Construction Contracts in the UAE

6UAE Federal Government, Federal Decree-Law No. (25) of 2025 Promulgating the Civil Transactions Law. Art 224, 236, 955, 963, 966. Effective 1 Jun 2026. Last checked 4 Nov 2026. Source document: Federal Decree-Law No. (25) of 2025 Promulgating the Civil Transactions Law

7Central Bank of the UAE, Annual Statistical Report for the Insurance Sector of the UAE 2025, 2025 statistics with 2024 comparatives. Sections 3.3 and 3.9, Table 12A. Last checked 4 Nov 2026. Source document: Annual Statistical Report for the Insurance Sector of the UAE 2025

8Abu Dhabi Ports Company PJSC, via US SEC EDGAR, Warehouse and Plot Lease, KIZAD Logistics Park. Cl 21.1. Last checked 4 Nov 2026. Source document: Warehouse and Plot Lease, KIZAD Logistics Park

9Scientific Reports, via PubMed Central, An extreme rainfall event over the United Arab Emirates in April 2024: Role of dynamic and thermodynamic drivers, 2 June 2026. Last checked 4 Nov 2026. Source document: An extreme rainfall event over the United Arab Emirates in April 2024: Role of dynamic and thermodynamic drivers

10Guy Carpenter, One Year On: Reflections on the Gulf Floods of April 2024, May 2025. Last checked 4 Nov 2026. Source document: One Year On: Reflections on the Gulf Floods of April 2024

Owner
Quotes.ae research team
Last review
Next review due
10 Feb 2027
Status
Published

Report an error